Skip to content

Latest commit

 

History

335 Commits

Folders and files

NameName
Last commit message
Last commit date
 
 
 
 
 
 
 
 
 
 

Repository files navigation

Project is currently on ice but will resume when I've finished up on my other tasks.

Here's a little sneak peak on the design and structure of the vault. It is mostly finished with the exception of integrating Obsidian Bases into the database section of the vault. The ideas still stand and are based on the experiences I've gathered while building the previous vault, which can be accessed by reverting to a commit prior to the "Great Reset", e.g. f063dc7d4b4495c3a6e7075b867a777f3c1b96bc.

About

Obsidian Vault for Knowledge Management. Includes a workflow for daily entries, journaling, projects and areas.

Topics

Resources

Stars

8 stars

Watchers

0 watching

Forks

Releases

Packages

Contributors