Skip to content

The setting button of the task node does not work when drawing a flowchart with the Activiti BPMN Visualizer plugin #421

@guobinhui

Description

@guobinhui

The version of the IDEA software I'm using is 2025.01, with the specific version number being 252. Whether I install the Activiti BPMN Visualizer plugin online through IDEA or install the latest offline version (until-build="242.*"), I encounter this issue: The "Settings" button on the right side of the task node does not work when right-clicking on the BPMN20.xml file to draw a flowchart, making it impossible to use it normally. As shown in the following figure:
Image

Metadata

Metadata

Assignees

No one assigned

    Labels

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions