Describe the bug
Although possible with the current workflow to rollback a release on prod. If the release needs to also undo a migration, the migration downgrade will need to be done manually. We need to look into what changes will be needed to handle this from the workflow.
Expected behavior
Rollback production and handle migration downgrade properly from workflow without having to manually mange that before the rollback
Steps to Reproduce
N/A
Possible solution (optional)
No response
My platform
No response
Additional context
No response
Describe the bug
Although possible with the current workflow to rollback a release on prod. If the release needs to also undo a migration, the migration downgrade will need to be done manually. We need to look into what changes will be needed to handle this from the workflow.
Expected behavior
Rollback production and handle migration downgrade properly from workflow without having to manually mange that before the rollback
Steps to Reproduce
N/A
Possible solution (optional)
No response
My platform
No response
Additional context
No response