Labels
Labels
4 labels
- Critical urgency. Someone must drop what they are doing to do this unless already dealing with a P0.
- High priority. This needs to be worked on in the next 10 days.
- Medium priority. This needs to be worked on in the next 2 months.
- Lower priority, but still scheduled. This needs to be worked on in the next 6 months.