Skip to content

Scheduled tasks don't seem to be working in GLPI 11 #47

@lucaslevi-consultor-glpi

Description

I was testing the plugin here in version 11, and from what I can see, the general layout remains the same—the tabs and tables. But I noticed something that might be a problem.

In this example, I opened a ticket based on a specific schedule that only starts at 8 p.m., and the plugin respected that—it didn’t start counting the time.

This was tested on GLPI version 10.0.24:

Image Image

This schedule starts at 8 p.m.; registration opened at 6 p.m. So far, so good.


However, in GLPI 11, in the same situation—with a ticket opened at 6 p.m. and the schedule not starting until 8 p.m.—the time began to count for the group, rather than remaining frozen as it did in GLPI 10 because the schedule was outside the hours for that ticket:

Image Image Image Image

I'm reporting this because it might be a bug; I couldn't find any related logs.

GLPI version 10: 10.0.24
GLPI version 11: 11.0.4

GLPI 10 plugin version: 10.0+1.2
GLPI 11 plugin version: I’m not entirely sure, but it should be version 11.0.4, which is available on GitHub; I downloaded it from the GLPI marketplace

Linux: both running PHP 8.2 and Ubuntu 22

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions