Skip to content

[P1][EVIDENCE] Collect and organize v0.2.0 release evidence #58

Description

@hkimw

Purpose

Release readiness tracker for v0.2.0. This issue tracks the collection and organization of evidence needed before a production release can be tagged. It does not claim timing is closed or that KV260 inference works — this is a preparation checklist, not a completion announcement.

Evidence required before v0.2.0 tag

Simulation logs

Synthesis / implementation

  • Post-synthesis timing already recorded (Vivado v2025.2, 2026-04-20)
    • core_clk WNS = −9.792 ns (post-synth, NOT MET — pessimistic before place-and-route)
    • axi_clk WNS = +2.253 ns (MET)
    • Post-synth utilization: 5 611 LUTs, 8 458 FFs, 80 RAMB36, 56 URAM, 4 DSP
  • Post-implementation timing closure run and results recorded ([P2][IMPL] Run post-implementation timing closure and bitstream smoke plan #29)
  • WNS/TNS for both clocks documented in release notes

KV260 bring-up (none completed yet)

  • Bitstream generated and SHA recorded
  • Boot sequence documented
  • UART/JTAG console log captured
  • Observed behavior and failure modes noted

Reproducibility

  • Exact simulation commands documented
  • Required Vivado version and hardware noted
  • Contributor path without hardware documented

Reference

Activity

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    area:verificationSimulation, testbench, golden model, or xsim verification.priority:P1Next milestone blockerstatus:readyTriaged and actionabletype:docsDocumentation-only change

    Type

    No type

    Projects

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions