This folder is the generated design catalogue. It is intentionally the single place for city outputs so the repo does not scatter deployment models across docs, scripts, and examples.
City folders follow:
designs/<region>/<country>/<City>/
Typical contents:
| File | Purpose |
|---|---|
README.md |
Human-readable generated design report |
design.toml |
Machine-readable design summary |
<slug>.toml |
Simulator scenario |
*-network-map.png |
Network map render |
| route GeoJSON | Line/station geometry |
| design-quality YAML | Soft/hard design gate results |
scripts/regenerate-city.sh samawahscripts/regenerate-all.sh --jobs 4The source city list and country assumptions live in ../lib/city-batches/world-sample.toml and ../lib/templates/.
- Samawah, Iraq: brownfield deployment instance
- Baghdad, Iraq: megacity network
- Karachi, Pakistan: largest catalogue catchment
- Lyon, France: high-OSM-density solver test
For hand-authored scenarios, use ../lib/examples/.
Generated from designs/*/*/*/design.toml. Sorted by USD CAPEX per route-km, then high-demand coverage.
High-demand coverage is the share of high-demand raster cells (demand >= 0.5) within about 400 m of a planned line. It is a demand / catchment proxy, not a land-area percentage.
| City | ISO | Family | Lines | Stations | km | Fleet | High-demand coverage | CAPEX | CAPEX/km | Charging microgrids |
|---|---|---|---|---|---|---|---|---|---|---|
| Bafoussam | CM | light-metro-3car |
3 | 34 | 73 | 116 | 47% | $537M | $7M | $12M |
| Erbil | IQ | metro-4car |
5 | 56 | 140 | 194 | 64% | $1.10bn | $8M | $21M |
| Fayoum | EG | light-metro-3car |
3 | 36 | 69 | 111 | 72% | $547M | $8M | $14M |
| Tanta | EG | light-metro-3car |
3 | 35 | 75 | 120 | 56% | $601M | $8M | $14M |
| Huye | RW | tram-2car |
3 | 28 | 46 | 101 | 23% | $369M | $8M | $10M |
| Agadir | MA | light-metro-3car |
3 | 44 | 83 | 130 | 65% | $668M | $8M | $17M |
| Kisumu | KE | light-metro-3car |
3 | 42 | 75 | 120 | 31% | $614M | $8M | $14M |
| Hofuf | SA | light-metro-3car |
3 | 46 | 78 | 123 | 50% | $639M | $8M | $18M |
| Damietta | EG | light-metro-3car |
3 | 38 | 74 | 118 | 72% | $602M | $8M | $13M |
| Bamenda | CM | light-metro-3car |
3 | 31 | 54 | 90 | 59% | $445M | $8M | $12M |
| Asyut | EG | light-metro-3car |
3 | 31 | 63 | 101 | 58% | $518M | $8M | $11M |
| Omdurman | SD | metro-4car |
6 | 104 | 255 | 340 | 47% | $2.11bn | $8M | $41M |
| Khamis Mushait | SA | light-metro-3car |
3 | 38 | 69 | 111 | 35% | $572M | $8M | $14M |
| Arusha | TZ | light-metro-3car |
3 | 44 | 73 | 116 | 36% | $608M | $8M | $16M |
| Hail | SA | light-metro-3car |
3 | 35 | 63 | 103 | 47% | $529M | $8M | $13M |
| Nablus | PS | light-metro-3car |
3 | 34 | 65 | 105 | 84% | $542M | $8M | $13M |
| Rahim Yar Khan | PK | light-metro-3car |
3 | 24 | 46 | 77 | 37% | $386M | $8M | $10M |
| Dammam | SA | metro-4car |
4 | 95 | 210 | 277 | 28% | $1.77bn | $8M | $39M |
| Vientiane | LA | light-metro-3car |
3 | 46 | 81 | 129 | 43% | $681M | $8M | $18M |
| Lyon | FR | metro-4car |
6 | 122 | 287 | 381 | 45% | $2.42bn | $8M | $49M |
| Kenitra | MA | light-metro-3car |
3 | 35 | 60 | 99 | 66% | $507M | $8M | $14M |
| Sylhet | BD | light-metro-3car |
3 | 40 | 73 | 115 | 45% | $616M | $8M | $14M |
| Tangier | MA | metro-4car |
5 | 64 | 153 | 209 | 57% | $1.30bn | $8M | $25M |
| Tunis | TN | metro-4car |
5 | 90 | 219 | 291 | 59% | $1.86bn | $9M | $36M |
| Dodoma | TZ | light-metro-3car |
3 | 36 | 66 | 106 | 40% | $565M | $9M | $14M |
| Thika | KE | light-metro-3car |
3 | 38 | 76 | 121 | 63% | $643M | $9M | $13M |
| Bukavu | CD | light-metro-3car |
3 | 37 | 60 | 98 | 60% | $517M | $9M | $15M |
| Al Kharj | SA | light-metro-3car |
3 | 38 | 68 | 110 | 70% | $583M | $9M | $14M |
| Hama | SY | light-metro-3car |
3 | 31 | 55 | 91 | 53% | $477M | $9M | $13M |
| Lira | UG | tram-2car |
3 | 23 | 45 | 101 | 64% | $392M | $9M | $10M |
| Mwanza | TZ | metro-4car |
5 | 70 | 162 | 220 | 45% | $1.40bn | $9M | $29M |
| Taif | SA | light-metro-3car |
3 | 42 | 73 | 117 | 41% | $637M | $9M | $17M |
| Hebron | PS | light-metro-3car |
3 | 40 | 69 | 111 | 61% | $600M | $9M | $16M |
| Bloemfontein | ZA | light-metro-3car |
3 | 42 | 72 | 115 | 35% | $626M | $9M | $16M |
| Tripoli Lb | LB | light-metro-3car |
3 | 30 | 53 | 87 | 50% | $462M | $9M | $12M |
| Karbala | IQ | metro-4car |
6 | 72 | 162 | 223 | 61% | $1.41bn | $9M | $30M |
| Port Harcourt | NG | metro-4car |
4 | 95 | 199 | 262 | 31% | $1.73bn | $9M | $39M |
| Lubango | AO | light-metro-3car |
3 | 31 | 55 | 91 | 63% | $475M | $9M | $12M |
| Suez | EG | light-metro-3car |
3 | 32 | 59 | 96 | 65% | $514M | $9M | $12M |
| Nakuru | KE | light-metro-3car |
3 | 37 | 60 | 97 | 46% | $521M | $9M | $14M |
| Zagazig | EG | light-metro-3car |
3 | 30 | 56 | 91 | 59% | $492M | $9M | $13M |
| Galle | LK | light-metro-3car |
3 | 37 | 64 | 104 | 56% | $564M | $9M | $15M |
| Gulu | UG | light-metro-3car |
3 | 36 | 64 | 105 | 50% | $558M | $9M | $15M |
| Kampala | UG | metro-4car |
4 | 99 | 201 | 266 | 24% | $1.76bn | $9M | $41M |
| Rajshahi | BD | light-metro-3car |
3 | 30 | 50 | 83 | 30% | $437M | $9M | $12M |
| Dhamar | YE | tram-2car |
3 | 18 | 32 | 74 | 76% | $285M | $9M | $8M |
| Aleppo | SY | metro-4car |
6 | 76 | 180 | 246 | 54% | $1.59bn | $9M | $33M |
| Duhok | IQ | light-metro-3car |
3 | 31 | 57 | 94 | 60% | $507M | $9M | $13M |
| Shinyanga | TZ | tram-2car |
3 | 20 | 37 | 84 | 83% | $325M | $9M | $9M |
| Gujranwala | PK | metro-4car |
4 | 72 | 160 | 214 | 39% | $1.42bn | $9M | $30M |
| Comilla | BD | light-metro-3car |
3 | 38 | 66 | 106 | 41% | $583M | $9M | $15M |
| Eldoret | KE | light-metro-3car |
3 | 39 | 65 | 105 | 46% | $578M | $9M | $16M |
| Rangpur | BD | light-metro-3car |
3 | 36 | 59 | 98 | 47% | $530M | $9M | $14M |
| Ranchi | IN | metro-4car |
6 | 96 | 216 | 292 | 50% | $1.92bn | $9M | $40M |
| Pokhara | NP | light-metro-3car |
3 | 44 | 82 | 130 | 52% | $733M | $9M | $18M |
| East London Za | ZA | light-metro-3car |
3 | 36 | 63 | 104 | 51% | $565M | $9M | $13M |
| Mukalla | YE | light-metro-3car |
3 | 33 | 61 | 98 | 72% | $544M | $9M | $14M |
| Arish | EG | tram-2car |
1 | 7 | 13 | 29 | 44% | $116M | $9M | $3M |
| Huambo | AO | light-metro-3car |
3 | 31 | 53 | 88 | 72% | $473M | $9M | $13M |
| Marrakech | MA | metro-4car |
6 | 79 | 191 | 262 | 58% | $1.71bn | $9M | $33M |
| Gazipur | BD | metro-4car |
6 | 127 | 308 | 408 | 38% | $2.76bn | $9M | $52M |
| Ibb | YE | light-metro-3car |
3 | 40 | 72 | 115 | 58% | $641M | $9M | $17M |
| Mecca | SA | metro-4car |
6 | 114 | 251 | 337 | 46% | $2.25bn | $9M | $49M |
| Namibe | AO | tram-2car |
3 | 25 | 40 | 90 | 61% | $361M | $9M | $11M |
| Ilorin | NG | light-metro-3car |
3 | 39 | 60 | 98 | 31% | $542M | $9M | $16M |
| Onitsha | NG | metro-4car |
4 | 76 | 184 | 244 | 30% | $1.65bn | $9M | $31M |
| Kigali | RW | metro-4car |
4 | 86 | 171 | 227 | 34% | $1.54bn | $9M | $37M |
| Benguela | AO | light-metro-3car |
3 | 28 | 50 | 83 | 69% | $451M | $9M | $11M |
| Baghdad | IQ | metro-6car |
9 | 182 | 506 | 664 | 87% | $4.57bn | $9M | $65M |
| Maputo | MZ | metro-4car |
6 | 83 | 186 | 252 | 71% | $1.68bn | $9M | $35M |
| Mombasa | KE | metro-4car |
6 | 95 | 201 | 273 | 52% | $1.82bn | $9M | $42M |
| Samawah | IQ | light-metro-3car |
3 | 31 | 58 | 96 | 57% | $530M | $9M | $13M |
| Mbuji Mayi | CD | metro-4car |
4 | 55 | 118 | 162 | 70% | $1.07bn | $9M | $25M |
| Damascus | SY | metro-4car |
6 | 84 | 199 | 270 | 72% | $1.81bn | $9M | $38M |
| Nampula | MZ | light-metro-3car |
3 | 30 | 52 | 85 | 67% | $471M | $9M | $12M |
| Kirkuk | IQ | metro-4car |
5 | 64 | 141 | 193 | 61% | $1.29bn | $9M | $28M |
| San Salvador | SV | metro-4car |
6 | 121 | 255 | 339 | 50% | $2.32bn | $9M | $56M |
| Meerut | IN | metro-4car |
4 | 84 | 180 | 239 | 43% | $1.64bn | $9M | $36M |
| Vijayawada | IN | metro-4car |
6 | 94 | 225 | 303 | 58% | $2.05bn | $9M | $41M |
| Zanzibar City | TZ | light-metro-3car |
3 | 32 | 56 | 91 | 70% | $514M | $9M | $12M |
| Kakamega | KE | tram-2car |
3 | 24 | 42 | 95 | 77% | $387M | $9M | $10M |
| Jizan | SA | light-metro-3car |
3 | 28 | 47 | 78 | 64% | $427M | $9M | $11M |
| Jinja | UG | tram-2car |
3 | 29 | 46 | 101 | 41% | $417M | $9M | $12M |
| Latakia | SY | light-metro-3car |
3 | 26 | 41 | 70 | 54% | $375M | $9M | $11M |
| Chimoio | MZ | light-metro-3car |
2 | 20 | 35 | 57 | 55% | $318M | $9M | $8M |
| Davao | PH | metro-4car |
6 | 108 | 229 | 307 | 72% | $2.10bn | $9M | $50M |
| Medina | SA | metro-4car |
5 | 104 | 211 | 282 | 47% | $1.95bn | $9M | $44M |
| Minya | EG | light-metro-3car |
3 | 32 | 53 | 87 | 69% | $490M | $9M | $12M |
| Kandy | LK | light-metro-3car |
3 | 43 | 78 | 125 | 56% | $717M | $9M | $16M |
| Khartoum | SD | metro-6car |
5 | 152 | 363 | 472 | 22% | $3.34bn | $9M | $57M |
| Baqubah | IQ | light-metro-3car |
3 | 31 | 54 | 89 | 64% | $497M | $9M | $13M |
| Visakhapatnam | IN | metro-4car |
6 | 110 | 240 | 321 | 52% | $2.21bn | $9M | $49M |
| Mazar E Sharif | AF | light-metro-3car |
3 | 37 | 63 | 102 | 59% | $581M | $9M | $16M |
| Idlib | SY | tram-2car |
3 | 18 | 35 | 79 | 79% | $322M | $9M | $8M |
| Sulaymaniyah | IQ | metro-4car |
4 | 51 | 117 | 162 | 67% | $1.08bn | $9M | $21M |
| Irbid | JO | light-metro-3car |
3 | 33 | 56 | 92 | 42% | $517M | $9M | $15M |
| Jalalabad Af | AF | light-metro-3car |
3 | 32 | 51 | 85 | 69% | $469M | $9M | $14M |
| El Obeid | SD | light-metro-3car |
3 | 28 | 46 | 78 | 72% | $426M | $9M | $11M |
| Madurai | IN | metro-4car |
6 | 104 | 222 | 299 | 59% | $2.06bn | $9M | $46M |
| Fallujah | IQ | light-metro-3car |
3 | 31 | 55 | 92 | 70% | $511M | $9M | $12M |
| Abha | SA | light-metro-3car |
3 | 45 | 70 | 113 | 34% | $646M | $9M | $18M |
| Songea | TZ | tram-2car |
1 | 7 | 11 | 26 | 73% | $106M | $9M | $3M |
| Aqaba | JO | tram-2car |
3 | 23 | 34 | 78 | 57% | $318M | $9M | $10M |
| Damanhur | EG | light-metro-3car |
3 | 22 | 41 | 71 | 77% | $385M | $9M | $10M |
| Nairobi | KE | metro-6car |
8 | 191 | 476 | 623 | 43% | $4.42bn | $9M | $73M |
| Jaffna | LK | light-metro-3car |
3 | 34 | 52 | 86 | 42% | $483M | $9M | $14M |
| Mahalla | EG | light-metro-3car |
3 | 22 | 38 | 64 | 69% | $354M | $9M | $9M |
| Narayanganj | BD | light-metro-3car |
3 | 50 | 82 | 131 | 27% | $766M | $9M | $18M |
| Rubavu | RW | tram-2car |
3 | 28 | 45 | 101 | 48% | $424M | $9M | $12M |
| Buraidah | SA | light-metro-3car |
3 | 54 | 80 | 127 | 35% | $746M | $9M | $24M |
| Mbarara | UG | light-metro-3car |
3 | 36 | 59 | 96 | 53% | $550M | $9M | $15M |
| Nelspruit | ZA | tram-2car |
3 | 22 | 39 | 88 | 68% | $368M | $9M | $10M |
| Ismailia | EG | light-metro-3car |
3 | 33 | 53 | 89 | 63% | $502M | $9M | $15M |
| Peshawar | PK | metro-4car |
4 | 87 | 197 | 261 | 33% | $1.85bn | $9M | $35M |
| Cuenca | EC | light-metro-3car |
3 | 48 | 79 | 125 | 57% | $741M | $9M | $21M |
| Kigoma | TZ | tram-2car |
3 | 24 | 35 | 79 | 77% | $331M | $9M | $11M |
| Niamey | NE | metro-4car |
4 | 80 | 146 | 197 | 38% | $1.38bn | $9M | $36M |
| Uige | AO | light-metro-3car |
1 | 8 | 13 | 23 | 67% | $123M | $9M | $4M |
| Raipur | IN | metro-4car |
5 | 88 | 185 | 249 | 43% | $1.76bn | $9M | $37M |
| Nador | MA | tram-2car |
3 | 19 | 34 | 79 | 70% | $326M | $10M | $9M |
| Kumba | CM | light-metro-3car |
3 | 29 | 43 | 72 | 68% | $404M | $10M | $12M |
| Lucknow | IN | metro-6car |
6 | 164 | 375 | 491 | 31% | $3.58bn | $10M | $64M |
| Meknes | MA | light-metro-3car |
3 | 23 | 39 | 67 | 58% | $376M | $10M | $10M |
| Kandahar | AF | light-metro-3car |
3 | 43 | 64 | 105 | 53% | $611M | $10M | $19M |
| Aden | YE | light-metro-3car |
3 | 29 | 46 | 78 | 72% | $439M | $10M | $12M |
| Kananga | CD | metro-4car |
2 | 18 | 38 | 55 | 73% | $366M | $10M | $8M |
| Tanga | TZ | light-metro-3car |
3 | 27 | 48 | 81 | 72% | $463M | $10M | $12M |
| Sohag | EG | light-metro-3car |
3 | 32 | 60 | 99 | 68% | $579M | $10M | $13M |
| Ouagadougou | BF | metro-4car |
6 | 138 | 264 | 352 | 37% | $2.54bn | $10M | $64M |
| Hyderabad Pk | PK | metro-4car |
6 | 84 | 182 | 247 | 61% | $1.75bn | $10M | $38M |
| Morogoro | TZ | light-metro-3car |
3 | 32 | 55 | 91 | 61% | $530M | $10M | $13M |
| Conakry | GN | metro-4car |
3 | 55 | 93 | 127 | 40% | $899M | $10M | $25M |
| Kanpur | IN | metro-6car |
7 | 150 | 339 | 450 | 44% | $3.27bn | $10M | $61M |
| Quelimane | MZ | light-metro-3car |
1 | 6 | 10 | 18 | 48% | $99M | $10M | $3M |
| Fort Portal | UG | tram-2car |
3 | 21 | 36 | 83 | 84% | $351M | $10M | $10M |
| Dar Es Salaam | TZ | metro-6car |
7 | 163 | 393 | 517 | 28% | $3.80bn | $10M | $62M |
| Hoima | UG | tram-2car |
3 | 19 | 31 | 74 | 84% | $303M | $10M | $9M |
| Agra | IN | metro-4car |
5 | 98 | 191 | 257 | 39% | $1.85bn | $10M | $45M |
| Polokwane | ZA | light-metro-3car |
3 | 34 | 52 | 86 | 60% | $501M | $10M | $15M |
| Ramadi | IQ | light-metro-3car |
3 | 28 | 45 | 75 | 59% | $437M | $10M | $13M |
| Barisal | BD | light-metro-3car |
3 | 30 | 59 | 96 | 50% | $571M | $10M | $12M |
| Arua | UG | tram-2car |
3 | 23 | 37 | 84 | 78% | $360M | $10M | $11M |
| Hillah | IQ | light-metro-3car |
3 | 30 | 49 | 82 | 70% | $480M | $10M | $13M |
| Mogadishu | SO | metro-4car |
4 | 68 | 128 | 174 | 40% | $1.25bn | $10M | $31M |
| Mandalay | MM | metro-4car |
6 | 88 | 187 | 254 | 60% | $1.82bn | $10M | $42M |
| Amman | JO | metro-6car |
9 | 150 | 354 | 473 | 67% | $3.47bn | $10M | $59M |
| Naivasha | KE | tram-2car |
3 | 20 | 33 | 75 | 86% | $323M | $10M | $9M |
| Malindi | KE | tram-2car |
3 | 20 | 29 | 69 | 79% | $289M | $10M | $9M |
| Bandung | ID | metro-4car |
6 | 126 | 257 | 343 | 41% | $2.53bn | $10M | $57M |
| Beira | MZ | light-metro-3car |
3 | 39 | 54 | 90 | 37% | $530M | $10M | $17M |
| Mansoura Eg | EG | light-metro-3car |
3 | 34 | 56 | 92 | 54% | $552M | $10M | $15M |
| Raqqa | SY | light-metro-3car |
3 | 25 | 45 | 76 | 86% | $443M | $10M | $11M |
| Luxor | EG | light-metro-3car |
3 | 34 | 54 | 89 | 73% | $532M | $10M | $15M |
| Maroua | CM | light-metro-3car |
3 | 29 | 53 | 86 | 74% | $520M | $10M | $12M |
| Colombo | LK | metro-6car |
6 | 126 | 278 | 370 | 42% | $2.75bn | $10M | $51M |
| Multan | PK | metro-4car |
4 | 64 | 115 | 158 | 42% | $1.14bn | $10M | $31M |
| Sanaa | YE | metro-6car |
7 | 97 | 232 | 314 | 72% | $2.30bn | $10M | $43M |
| Goma | CD | light-metro-3car |
3 | 39 | 58 | 96 | 60% | $578M | $10M | $17M |
| Homs | SY | light-metro-3car |
3 | 24 | 40 | 68 | 48% | $397M | $10M | $11M |
| Masaka | UG | tram-2car |
3 | 20 | 32 | 74 | 56% | $320M | $10M | $9M |
| Entebbe | UG | tram-2car |
3 | 28 | 43 | 98 | 70% | $432M | $10M | $13M |
| Khulna | BD | metro-4car |
6 | 82 | 182 | 249 | 57% | $1.82bn | $10M | $37M |
| Varanasi | IN | metro-4car |
5 | 100 | 202 | 271 | 47% | $2.02bn | $10M | $43M |
| Nacala | MZ | tram-2car |
3 | 25 | 39 | 88 | 80% | $390M | $10M | $11M |
| Patna | IN | metro-4car |
5 | 84 | 185 | 250 | 50% | $1.86bn | $10M | $36M |
| Sidon | LB | tram-2car |
3 | 23 | 37 | 83 | 71% | $373M | $10M | $11M |
| Luanda | AO | metro-6car |
9 | 170 | 390 | 522 | 64% | $3.91bn | $10M | $71M |
| Bhopal | IN | metro-4car |
6 | 107 | 206 | 279 | 52% | $2.07bn | $10M | $51M |
| Jos | NG | light-metro-3car |
3 | 40 | 54 | 90 | 26% | $542M | $10M | $17M |
| Vadodara | IN | metro-4car |
5 | 89 | 164 | 220 | 48% | $1.65bn | $10M | $43M |
| Kisangani | CD | metro-4car |
2 | 27 | 47 | 66 | 64% | $477M | $10M | $13M |
| Taiz | YE | light-metro-3car |
3 | 33 | 49 | 82 | 55% | $494M | $10M | $15M |
| Kisii | KE | tram-2car |
3 | 17 | 30 | 69 | 67% | $299M | $10M | $8M |
| Indore | IN | metro-6car |
7 | 146 | 324 | 429 | 48% | $3.28bn | $10M | $62M |
| Mbeya | TZ | light-metro-3car |
3 | 39 | 55 | 90 | 44% | $558M | $10M | $18M |
| Bahawalpur | PK | light-metro-3car |
3 | 29 | 46 | 78 | 42% | $469M | $10M | $14M |
| Mosul | IQ | metro-4car |
6 | 82 | 203 | 275 | 62% | $2.06bn | $10M | $31M |
| Phnom Penh | KH | metro-4car |
6 | 107 | 228 | 307 | 48% | $2.32bn | $10M | $47M |
| Deir Ez Zor | SY | light-metro-3car |
3 | 32 | 57 | 93 | 62% | $578M | $10M | $14M |
| Gaza City | PS | light-metro-3car |
3 | 23 | 37 | 64 | 57% | $380M | $10M | $10M |
| Lusaka | ZM | metro-6car |
6 | 123 | 236 | 316 | 34% | $2.41bn | $10M | $53M |
| Kinshasa | CD | metro-6car |
8 | 183 | 385 | 509 | 49% | $3.95bn | $10M | $82M |
| Rajkot | IN | metro-4car |
5 | 76 | 143 | 195 | 58% | $1.47bn | $10M | $36M |
| Herat | AF | light-metro-3car |
3 | 43 | 65 | 106 | 36% | $666M | $10M | $19M |
| Durban | ZA | metro-6car |
9 | 172 | 401 | 534 | 79% | $4.13bn | $10M | $75M |
| Fez | MA | metro-4car |
4 | 58 | 113 | 154 | 73% | $1.16bn | $10M | $28M |
| Garissa | KE | tram-2car |
3 | 19 | 29 | 66 | 71% | $297M | $10M | $9M |
| Coimbatore | IN | metro-6car |
5 | 121 | 268 | 352 | 31% | $2.77bn | $10M | $51M |
| Nyala | SD | light-metro-3car |
3 | 29 | 47 | 77 | 61% | $484M | $10M | $11M |
| Basra | IQ | metro-6car |
7 | 117 | 303 | 403 | 77% | $3.14bn | $10M | $44M |
| Tabuk | SA | light-metro-3car |
3 | 45 | 63 | 101 | 27% | $653M | $10M | $20M |
| Jeddah | SA | metro-6car |
8 | 202 | 406 | 537 | 45% | $4.22bn | $10M | $93M |
| Kut | IQ | light-metro-3car |
3 | 25 | 46 | 78 | 60% | $483M | $10M | $10M |
| Tetouan | MA | light-metro-3car |
3 | 33 | 54 | 88 | 69% | $562M | $10M | $14M |
| Najaf | IQ | metro-4car |
6 | 74 | 163 | 225 | 52% | $1.70bn | $10M | $36M |
| Antananarivo | MG | metro-6car |
7 | 155 | 339 | 450 | 42% | $3.52bn | $10M | $65M |
| Karachi | PK | metro-6car |
9 | 231 | 472 | 622 | 48% | $4.92bn | $10M | $100M |
| Qena | EG | light-metro-3car |
3 | 26 | 45 | 77 | 75% | $470M | $10M | $12M |
| Lobito | AO | light-metro-3car |
3 | 25 | 38 | 65 | 69% | $394M | $10M | $12M |
| Safi | MA | light-metro-3car |
3 | 26 | 39 | 67 | 72% | $410M | $10M | $12M |
| Port Sudan | SD | light-metro-3car |
3 | 22 | 33 | 58 | 80% | $348M | $10M | $10M |
| Dakar | SN | metro-6car |
5 | 107 | 204 | 272 | 52% | $2.13bn | $10M | $47M |
| Chittagong | BD | metro-6car |
8 | 161 | 374 | 497 | 64% | $3.91bn | $10M | $71M |
| Quetta | PK | metro-4car |
5 | 78 | 140 | 194 | 54% | $1.46bn | $10M | $39M |
| Meru Ke | KE | tram-2car |
2 | 12 | 22 | 50 | 52% | $231M | $10M | $5M |
| Beni Mellal | MA | tram-2car |
3 | 18 | 30 | 71 | 85% | $317M | $10M | $9M |
| Kano | NG | metro-6car |
6 | 154 | 362 | 476 | 37% | $3.80bn | $10M | $57M |
| Waw | SD | tram-2car |
2 | 11 | 18 | 42 | 73% | $189M | $11M | $6M |
| Oujda | MA | light-metro-3car |
3 | 33 | 47 | 79 | 48% | $496M | $11M | $16M |
| La Paz | BO | metro-4car |
6 | 115 | 212 | 286 | 57% | $2.25bn | $11M | $55M |
| Kafr El Sheikh | EG | tram-2car |
3 | 22 | 33 | 75 | 75% | $350M | $11M | $11M |
| Edea | CM | tram-2car |
1 | 7 | 10 | 23 | 61% | $102M | $11M | $4M |
| Nasiriyah | IQ | light-metro-3car |
3 | 27 | 51 | 86 | 59% | $548M | $11M | $11M |
| Xai Xai | MZ | tram-2car |
2 | 12 | 18 | 43 | 43% | $191M | $11M | $6M |
| Maiduguri | NG | metro-4car |
5 | 86 | 176 | 236 | 34% | $1.88bn | $11M | $38M |
| Kitale | KE | tram-2car |
3 | 16 | 29 | 68 | 85% | $314M | $11M | $8M |
| Surabaya | ID | metro-6car |
7 | 143 | 294 | 393 | 40% | $3.14bn | $11M | $61M |
| Machakos | KE | tram-2car |
3 | 16 | 27 | 64 | 76% | $284M | $11M | $8M |
| Port Said | EG | light-metro-3car |
3 | 25 | 35 | 61 | 71% | $374M | $11M | $12M |
| Najran | SA | light-metro-3car |
3 | 33 | 57 | 93 | 46% | $607M | $11M | $13M |
| Beni Suef | EG | light-metro-3car |
3 | 23 | 35 | 62 | 55% | $374M | $11M | $11M |
| Soyo | AO | tram-2car |
2 | 14 | 22 | 52 | 70% | $241M | $11M | $7M |
| Hurghada | EG | tram-2car |
3 | 28 | 43 | 95 | 56% | $460M | $11M | $13M |
| Kathmandu | NP | metro-4car |
6 | 103 | 203 | 275 | 46% | $2.18bn | $11M | $51M |
| Diwaniyah | IQ | light-metro-3car |
3 | 28 | 46 | 78 | 58% | $498M | $11M | $12M |
| Uyo | NG | light-metro-3car |
3 | 24 | 31 | 56 | 25% | $336M | $11M | $12M |
| Pemba Mz | MZ | tram-2car |
3 | 20 | 30 | 70 | 63% | $329M | $11M | $10M |
| Beirut | LB | metro-4car |
6 | 74 | 141 | 198 | 63% | $1.54bn | $11M | $39M |
| Sayun | YE | tram-2car |
2 | 15 | 22 | 49 | 58% | $235M | $11M | $7M |
| Bertoua | CM | light-metro-3car |
3 | 20 | 29 | 52 | 77% | $316M | $11M | $10M |
| Yaounde | CM | metro-6car |
8 | 136 | 267 | 362 | 43% | $2.93bn | $11M | $63M |
| Yangon | MM | metro-6car |
9 | 214 | 418 | 556 | 56% | $4.62bn | $11M | $102M |
| Tartus | SY | tram-2car |
3 | 23 | 35 | 80 | 73% | $388M | $11M | $11M |
| Lubumbashi | CD | metro-4car |
4 | 75 | 130 | 176 | 34% | $1.44bn | $11M | $39M |
| Kabul | AF | metro-6car |
7 | 137 | 261 | 353 | 53% | $2.89bn | $11M | $63M |
| Ngaoundere | CM | light-metro-3car |
3 | 19 | 28 | 51 | 57% | $315M | $11M | $9M |
| Lahij | YE | tram-2car |
3 | 19 | 29 | 67 | 82% | $326M | $11M | $10M |
| Zarqa | JO | light-metro-3car |
3 | 57 | 83 | 132 | 48% | $938M | $11M | $24M |
| Hodeidah | YE | light-metro-3car |
3 | 27 | 36 | 63 | 61% | $411M | $11M | $13M |
| Douala | CM | metro-6car |
5 | 129 | 228 | 304 | 37% | $2.61bn | $11M | $59M |
| Benin City | NG | metro-4car |
4 | 77 | 132 | 179 | 44% | $1.52bn | $11M | $40M |
| Bamako | ML | metro-4car |
6 | 118 | 257 | 344 | 31% | $2.96bn | $11M | $47M |
| Moshi | TZ | tram-2car |
3 | 21 | 36 | 82 | 76% | $417M | $12M | $11M |
| Faisalabad | PK | metro-6car |
5 | 93 | 166 | 224 | 52% | $1.94bn | $12M | $45M |
| Iringa | TZ | tram-2car |
3 | 20 | 28 | 65 | 67% | $325M | $12M | $10M |
| Aba Ng | NG | light-metro-3car |
3 | 26 | 34 | 60 | 40% | $401M | $12M | $13M |
| Sumbawanga | TZ | tram-2car |
1 | 5 | 7 | 16 | 35% | $77M | $12M | $3M |
| Larkana | PK | light-metro-3car |
2 | 19 | 38 | 62 | 28% | $453M | $12M | $9M |
| Kassala | SD | light-metro-3car |
3 | 20 | 34 | 60 | 76% | $417M | $12M | $9M |
| Ibadan | NG | metro-6car |
4 | 90 | 135 | 186 | 24% | $1.66bn | $12M | $44M |
| Amarah | IQ | light-metro-3car |
3 | 28 | 43 | 75 | 57% | $536M | $12M | $13M |
| Mymensingh | BD | light-metro-3car |
3 | 37 | 67 | 108 | 41% | $833M | $12M | $13M |
| Garoua | CM | light-metro-3car |
3 | 29 | 44 | 74 | 38% | $539M | $12M | $12M |
| Tete | MZ | light-metro-3car |
3 | 23 | 38 | 67 | 77% | $474M | $12M | $9M |
| Tabora | TZ | tram-2car |
2 | 13 | 18 | 42 | 54% | $223M | $13M | $7M |
| Khouribga | MA | tram-2car |
2 | 11 | 15 | 36 | 57% | $185M | $13M | $6M |
| Nyeri | KE | tram-2car |
3 | 22 | 37 | 84 | 62% | $470M | $13M | $10M |
| Jodhpur | IN | metro-4car |
5 | 82 | 150 | 205 | 44% | $1.93bn | $13M | $37M |
| Sialkot | PK | light-metro-3car |
3 | 37 | 59 | 96 | 43% | $840M | $14M | $16M |
| Sheikhupura | PK | light-metro-3car |
2 | 17 | 19 | 34 | 32% | $271M | $14M | $9M |
| Malanje | AO | light-metro-3car |
2 | 12 | 15 | 29 | 57% | $215M | $14M | $7M |
| Sukkur | PK | light-metro-3car |
3 | 31 | 51 | 86 | 55% | $746M | $15M | $13M |
| Biratnagar | NP | tram-2car |
3 | 23 | 34 | 78 | 60% | $648M | $19M | $10M |