Notifications
You must be signed in to change notification settings - Fork 1
Expand file tree
/
Copy pathtemp_results1.txt
More file actions
115 lines (98 loc) · 7.57 KB
/
temp_results1.txt
File metadata and controls
115 lines (98 loc) · 7.57 KB
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
Run 1 started
Run 1 finished at sim time 480
================================================================================
EARTHMOVING WITH TRUCK SIZES - SIMULATION RESULTS
================================================================================
Simulation Duration: 480.00 minutes (8.00 hours)
LOADER UTILIZATION:
Utilization Rate: 52.53%
(Loader was busy 52.53% of the time)
Note: Higher utilization indicates the loader is well-used
LOADER QUEUE STATISTICS:
Total waiting instances: 37
Average truck waiting time: 0.53 minutes
Maximum truck waiting time: 13.25 minutes
Minimum truck waiting time: 0.00 minutes
(Shows how much congestion at the loader)
================================================================================
TRUCK PERFORMANCE ANALYSIS (Impact of Size Attribute)
================================================================================
TRUCK 0 - Size: 30 m│ per load
Completed cycles: 13
Expected loading time: 5 + 30/20 = 6.50 minutes
Average actual loading time: 6.50 minutes
Total dirt moved: 390 m│
Efficiency (dirt per cycle): 30 m│
TRUCK 1 - Size: 35 m│ per load
Completed cycles: 12
Expected loading time: 5 + 35/20 = 6.75 minutes
Average actual loading time: 6.75 minutes
Total dirt moved: 420 m│
Efficiency (dirt per cycle): 35 m│
TRUCK 2 - Size: 50 m│ per load
Completed cycles: 12
Expected loading time: 5 + 50/20 = 7.50 minutes
Average actual loading time: 7.50 minutes
Total dirt moved: 600 m│
Efficiency (dirt per cycle): 50 m│
================================================================================
PROJECT SUMMARY
================================================================================
Total dirt moved: 1330 m│
Total load cycles: 37
Average dirt per cycle: 35.95 m│
Project duration: 480.00 minutes (8.00 hours)
================================================================================
TRUCK SCHEDULES (First 15 Actions Each)
Truck 0 (Size: 30 m│):
activity start_time finish_time
loading 0.0 6.5
hauling 6.5 23.5
dumping 23.5 26.5
return 26.5 39.5
loading 39.5 46.0
hauling 46.0 63.0
dumping 63.0 66.0
return 66.0 79.0
loading 79.0 85.5
hauling 85.5 102.5
dumping 102.5 105.5
return 105.5 118.5
loading 118.5 125.0
hauling 125.0 142.0
dumping 142.0 145.0
Truck 1 (Size: 35 m│):
activity start_time finish_time
loading 6.50 13.25
hauling 13.25 30.25
dumping 30.25 33.25
return 33.25 46.25
loading 46.25 53.00
hauling 53.00 70.00
dumping 70.00 73.00
return 73.00 86.00
loading 86.00 92.75
hauling 92.75 109.75
dumping 109.75 112.75
return 112.75 125.75
loading 125.75 132.50
hauling 132.50 149.50
dumping 149.50 152.50
Truck 2 (Size: 50 m│):
activity start_time finish_time
loading 13.25 20.75
hauling 20.75 37.75
dumping 37.75 40.75
return 40.75 53.75
loading 53.75 61.25
hauling 61.25 78.25
dumping 78.25 81.25
return 81.25 94.25
loading 94.25 101.75
hauling 101.75 118.75
dumping 118.75 121.75
return 121.75 134.75
loading 134.75 142.25
hauling 142.25 159.25
dumping 159.25 162.25
================================================================================