Skip to content

update keratin to 34.1 #1511

update keratin to 34.1

update keratin to 34.1 #1511

Triggered via push July 12, 2025 18:19
Status Failure
Total duration 1m 9s
Artifacts

build.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

39 errors
build (a1.0.1_01)
Process completed with exit code 1.
build (a1.1.0)
Process completed with exit code 1.
build (a1.1.0)
The strategy configuration was canceled because "build.a1_0_1_01" failed
build (1.1)
The operation was canceled.
build (1.1)
The strategy configuration was canceled because "build.a1_0_1_01" failed
build (b1.0)
The operation was canceled.
build (b1.0)
The strategy configuration was canceled because "build.a1_0_1_01" failed
build (a1.2.0)
The operation was canceled.
build (a1.2.0)
The strategy configuration was canceled because "build.a1_0_1_01" failed
build (1.2)
The operation was canceled.
build (1.2)
The strategy configuration was canceled because "build.a1_0_1_01" failed
build (a1.2.6)
The operation was canceled.
build (a1.2.6)
The strategy configuration was canceled because "build.a1_0_1_01" failed
build (1.5)
The operation was canceled.
build (1.5)
The strategy configuration was canceled because "build.a1_0_1_01" failed
build (b1.6)
The operation was canceled.
build (b1.6)
The strategy configuration was canceled because "build.a1_0_1_01" failed
build (1.9)
The operation was canceled.
build (1.9)
The strategy configuration was canceled because "build.a1_0_1_01" failed
build (1.8)
The operation was canceled.
build (1.8)
The strategy configuration was canceled because "build.a1_0_1_01" failed
build (1.6)
The operation was canceled.
build (1.6)
The strategy configuration was canceled because "build.a1_0_1_01" failed
build (1.7)
The operation was canceled.
build (1.7)
The strategy configuration was canceled because "build.a1_0_1_01" failed
build (b1.5)
The operation was canceled.
build (b1.5)
The strategy configuration was canceled because "build.a1_0_1_01" failed
build (1.4)
The operation was canceled.
build (1.4)
The strategy configuration was canceled because "build.a1_0_1_01" failed
build (b1.8)
The operation was canceled.
build (b1.8)
The strategy configuration was canceled because "build.a1_0_1_01" failed
build (b1.2)
The operation was canceled.
build (b1.2)
The strategy configuration was canceled because "build.a1_0_1_01" failed
build (b1.7)
The operation was canceled.
build (b1.7)
The strategy configuration was canceled because "build.a1_0_1_01" failed
build (1.0)
The operation was canceled.
build (1.0)
The strategy configuration was canceled because "build.a1_0_1_01" failed
build (1.3)
The operation was canceled.
build (1.3)
The strategy configuration was canceled because "build.a1_0_1_01" failed