Build a draft sprint scope from the current backlog, visible dependencies, and maintenance pressure.
Run before sprint planning or whenever maintainers want a current proposal for the next focused work window.
- Review the backlog for work that is ready, blocked, partially in progress, or tied to urgent support and release commitments.
- Draft a realistic sprint scope using only work with enough clarity to start, while accounting for visible dependencies, unresolved blockers, and maintenance load.
- Separate must-do items from stretch items so the proposal can survive real-world interruptions and urgent support work.
- Flag work that should not enter the sprint yet because it is underspecified, blocked by another team, or likely too large for one cycle.
- Use safe outputs to publish one planning draft that groups proposed work by priority, dependency risk, and readiness.
- If capacity assumptions are missing, make that explicit instead of pretending the scope is final.
- Prefer a plan that is slightly conservative over a plan that collapses as soon as one dependency slips.
- Keep the result useful for a planning meeting: practical, constrained, and easy to debate.
- A draft sprint plan that gives maintainers a credible starting point instead of a raw issue list.
- Clear distinction between committed work, stretch work, and work that should stay out of scope.
- Define what “ready” means in your team so the planner does not pull in ambiguous backlog items.
- If you run fixed-length sprints, note the expected cycle length and capacity assumptions.
- If your team reserves explicit capacity for bugs or interrupts, encode that constraint here.
- Keep the planning output in one canonical issue or planning note so discussion stays centralized.