Replies: 1 comment
-
|
We could refactor and frame this as a Zero-Trust Event & Reward System rather than just a gamification engine. In this model, the core component becomes a Zero-Trust Event Engine that:
Then Project B (BACON) would simply consume verified events from this engine. |
Beta Was this translation helpful? Give feedback.
0 replies
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Uh oh!
There was an error while loading. Please reload this page.
Uh oh!
There was an error while loading. Please reload this page.
-
Idea V — Unified Event-Driven Gamification Engine (350h)
Repository: OWASP/BLT-API
Goal
Architect and implement a robust, event-driven engine to handle all reputation, scoring, and reward logic across the BLT ecosystem, decoupling it from core business logic using a Pub/Sub model and a double-entry ledger.
Summary
As BLT scales with Projects B (Rewards), F (Reputation), and H (Growth), hardcoding reward logic into view functions (e.g., "awarding points inside the PR merge handler") creates brittle, unmaintainable code.
Idea U implements a dedicated Gamification Service that listens for localized platform events (e.g.,
PR_MERGED,VULN_VERIFIED,REVIEW_COMPLETED), processes them through a configurable Rule Engine, and records transactions in a Double-Entry Ledger. This ensures data consistency, prevents "infinite money" bugs, and allows maintainers to tweak the "Game Economy" (e.g., changing point values) without redeploying backend code.Deliverables
1. Event Bus Infrastructure
event_id,source,timestamp,actor_id,payload,signature) to ensure traceability.2. Configurable Rule Engine
IF event == 'PR_MERGED' AND pr.labels contains 'security' THEN award 50 XP.3. Double-Entry Ledger System
Ledgermodel (debit_account,credit_account,amount,reference_event_id).4. Integration Adapters
@emit_event) for other BLT services (e.g., NetGuardian) to trigger rewards easily.5. Economy Admin Dashboard
Timeline (Week-by-Week)
Phase 1: Architecture & Ledger Core (Weeks 1–4)
Phase 2: Rule Engine & Ingestion (Weeks 5–8)
pr.merged,issue.created).Phase 3: Integration & Dashboard (Weeks 9–12)
Phase 4: Polish & Scaling (Weeks 13–16)
Benefits
user.score += 5implementations.Beta Was this translation helpful? Give feedback.
All reactions