Skip to content

[rrfs-nco] Adjust Wall Clock Limit to Meet Guidance #1371

@JamesPolly-NCO

Description

@JamesPolly-NCO

Model Implementation Overview documents contain the following guidance on job run times and wallclock directives:

Must be done before starting the 30 day test… Rules:
0-2 minutes = minimum 10 minute wall clock
3-10 minutes = minimum 15 minute wall clock
11-15 minutes = minimum 25 minute wall lock
16-20 minutes = minimum 30 minute wall clock
21+ minutes = minimum… runtime * 1.25 rounded up  to the nearest 5 min

*: See footnote at bottom.

The following job(s) will need to have their PBS walltime directive adjusted to meet the above criteria:

  • ecf/scripts/post/det/jrrfs_det_post_master.ecf

Some forecast hours associated with this template ecf file are currently requiring +11 minutes to complete.

Thus the recommendation is to adjust the walltime directive to 25 minutes.

*: I've created an issue for this to be a part of the EE2 standards doc. At present, I believe this guidance only exists as a part of the IT Test documentation.

Metadata

Metadata

Labels

EE2-CRITICALThings that absolutely must be done before RRFSv1 is ready for production.EE2-specificFocused on improving EE2 compliance

Type

No type

Projects

No projects

Milestone

No milestone

Relationships

None yet

Development

No branches or pull requests

Issue actions