Skip to content

Energy meter solar kit installation in EU #75

@MassimilianoBiancucci

Description

@MassimilianoBiancucci

Hi,
I bought the solar kit, and I realized that is designed for a two-phase system after purchasing it, while in my country I have a single-phase grid supply at 230V 50Hz (1 phase + neutral), and I would like to know if I should be able to configure the system anyway using only the standard calibration, and without installing the CT2 and the SCT2 clamps, or I need to change the code and recompile it.

Have you any hint for such type of configuration??

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions