Skip to content

feat: add GCS customer-supplied encryption key (CSEK) support #1850

feat: add GCS customer-supplied encryption key (CSEK) support

feat: add GCS customer-supplied encryption key (CSEK) support #1850

Re-run triggered January 14, 2026 14:33
Status Failure
Total duration 27m 26s
Artifacts 2

build.yaml

on: pull_request
Matrix: Build
Matrix: Test
Matrix: Testflows
Fit to window
Zoom out
Zoom in

Annotations

34 errors
Testflows (1.25, 23.3)
Process completed with exit code 1.
Testflows (1.25, 22.3)
The strategy configuration was canceled because "testflows._1_25_23_3" failed
Testflows (1.25, 22.3)
Process completed with exit code 1.
Testflows (1.25, 24.8)
The strategy configuration was canceled because "testflows._1_25_23_3" failed
Testflows (1.25, 24.8)
Process completed with exit code 1.
Testflows (1.25, 25.3)
The strategy configuration was canceled because "testflows._1_25_23_3" failed
Testflows (1.25, 25.3)
The operation was canceled.
Testflows (1.25, 22.8)
The strategy configuration was canceled because "testflows._1_25_23_3" failed
Testflows (1.25, 22.8)
The operation was canceled.
Testflows (1.25, 25.8)
The strategy configuration was canceled because "testflows._1_25_23_3" failed
Testflows (1.25, 25.8)
The operation was canceled.
Testflows (1.25, 24.3)
The strategy configuration was canceled because "testflows._1_25_23_3" failed
Testflows (1.25, 24.3)
The operation was canceled.
Testflows (1.25, 23.8)
The strategy configuration was canceled because "testflows._1_25_23_3" failed
Testflows (1.25, 23.8)
The operation was canceled.
Testflows (1.25, 25.12)
The strategy configuration was canceled because "testflows._1_25_23_3" failed
Testflows (1.25, 25.12)
The operation was canceled.
Test (1.25, 21.8)
Process completed with exit code 1.
Test (1.25, 22.8)
The strategy configuration was canceled because "test._1_25_21_8" failed
Test (1.25, 22.8)
The operation was canceled.
Test (1.25, 23.3)
The strategy configuration was canceled because "test._1_25_21_8" failed
Test (1.25, 23.3)
The operation was canceled.
Test (1.25, 23.8)
The strategy configuration was canceled because "test._1_25_21_8" failed
Test (1.25, 23.8)
The operation was canceled.
Test (1.25, 25.3)
The strategy configuration was canceled because "test._1_25_21_8" failed
Test (1.25, 25.3)
The operation was canceled.
Test (1.25, 24.3)
The strategy configuration was canceled because "test._1_25_21_8" failed
Test (1.25, 24.3)
The operation was canceled.
Test (1.25, 24.8)
The strategy configuration was canceled because "test._1_25_21_8" failed
Test (1.25, 24.8)
The operation was canceled.
Test (1.25, 25.8)
The strategy configuration was canceled because "test._1_25_21_8" failed
Test (1.25, 25.8)
The operation was canceled.
Test (1.25, 25.12)
The strategy configuration was canceled because "test._1_25_21_8" failed
Test (1.25, 25.12)
The operation was canceled.

Artifacts

Produced during runtime
Name Size Digest
build-artifacts Expired
128 MB
sha256:4e8f11ed6568275ccbb07bfc168a3af7af3c7ab3d6c6a3294a3a5c49b8f5cd68
build-test-artifacts Expired
73.6 MB
sha256:9579482753707a947c4fe42be192170102363a8b295abc811ebc60eaf62930f3